These pictures cover the last three months of work on these bookshelves. The corner was the hardest piece to build and definitely the heaviest section to move.
Bryan and Cooper get the credit for moving this beast into the house.
I measured and cut out the cold air return holes while the corner piece was still in the garage. I cut the outlet holes inside the house.
Once all the individual units were completed and in place, we had to attach them to each other. That's what I'm doing here. Also, it's kind of interesting to see the scale of these things. They're pretty big.
In order to install the final bookcase, we needed to move a light switch from one side of the wall to the other. Thankfully, Bryan took on that task. It helped that there was an old phone jack right where we wanted to put the new switch.
When my brother's family visited in October I put the shelves in so we could get all the books off the floors (the rest of the books were on shelves in the basement). That's when I learned that my carefully cut shelves weren't all the correct size. Lots of sanding and just a little cutting later, they fit.
Bryan and Cooper helped install the top and bottom trim.
I took on the task of doing all the front trim. This also required soooooooo much sanding to get the fit just right.
They're technically not done yet. The carpet is rolled back down but not tacked yet. I want to find just the right crown molding. And I need to empty them and add two coats of water-based matte polyurethane to protect the wood. Since we were hosting some small, active people for Thanksgiving, I figured it would be better to fill up the shelves rather than have what could be mistaken for several ladders ready for climbing.
I'm really happy with them.